Skip to main content
Advertising

Picking Up The Pieces

!The 80-foot high steel frame practice structure was completed in 2004.

This article has been reproduced in a new format and may be missing content or contain faulty links. Please use the Contact Us link in our site footer to report an issue.
Advertising